Challenge
The flooring continued beside cabinets and through narrow transitions. Small adhered sections, edge details, and the need to protect finished cabinetry made the scope more involved than a clear-room tear-out.
Residential case study • Cary, NC
This Cary project extended through a kitchen and connected rooms, with glue-down engineered hardwood installed over a wood subfloor. The work had to move around cabinetry, transitions, and protected adjacent finishes while keeping the downstream repair and flooring plan in view.

What the project required
The flooring continued beside cabinets and through narrow transitions. Small adhered sections, edge details, and the need to protect finished cabinetry made the scope more involved than a clear-room tear-out.
From condition to handoff

The flooring continued beside cabinets and through narrow transitions. Small adhered sections, edge details, and the need to protect finished cabinetry made the scope more involved than a clear-room tear-out.

Cabinet faces and nearby finishes were protected before production. The floor was scored into workable sections, released with specialized equipment, and detailed at edges and transitions as each room opened up.

The wood subfloor was exposed through the agreed areas so the project team could evaluate the surface and continue with the next repair or installation phase.
Field documentation
Additional details from the same Carolina Floor Demolition project. Customer names, street addresses, and embedded location data are not published.


Free project estimate
Tell us what is installed, where the project is, and what needs to happen next. We’ll help define the removal and prep scope.